1.
Physics Laboratory for US
REC: Begin now or wait and
include in SEA.
2.
Sports and
Education Annex (SEA)
(to include 2nd gym, dance studio, additional Upper
School Classrooms)
REC: Begin now.
3.
Strings
Instrumental Rehearsal Room
REC: Temporary move to sports & Fitness Center.
Move to the Fine Arts Bldg. where dance studio is
located, move dance studio to located, move dance
studio to SEA.
4. Additional World
Arts Classroom
REC: Include in SEA or in Upper
School when SEA is built.
5.
One Additional
Middle School
Classroom
REC: Need now. Consider splitting
M125 into two rooms.
6.
Lighting for the
Baseball & Soccer/
Track Fields
REC: Build now.
7. Outdoor Bathroom
and Concession
Facility
REC: Build now.
8.
Additional Parking
Area-30 spaces (Approx.
100 spaces)
REC: Determine location and build now.
9.
Improve Vehicular
Traffic Flow
REC: Commission an outside professional
to review by July 1, 2000.
10.
Storage Needs for
Admin. Bldg. Offices
REC: Utilize basement getting climate
controlled, locked areas. Build
by June, 2001.
11.
Expansion of
Nurse's Office
REC: Possibly expand into adjacent
conference room. Ask Middle
School to prioritize need.
12.
Concrete Pad
Outside Fine Arts
Backstage Shop
REC: Complete by Sept. 1, 2000.
13.
Business Office
Workroom
REC: Look for location.
14.
Additional Locker
Space for Upper
School Students
REC: Place hooks on walls opposite
lockers; build cubbies at end
of halls.
15.
Landscaping/External Gathering Areas
REC: Establish a long-term committee
with own budget to address needs.
16. Additional
Internal Sitting Areas for
Students
REC: The person responsible for each
each building should address
this need.
|
1.
Three add'l US Classrooms for Humanities
REC: Include in SEA or in Upper School
when SEA is built.
2.
Ceramics Studio
cost - undetermined
REC: Check feasibility of enclosing and
covering small area outside Fine Arts
Building by June, 2001.
3. Extended Day
Space/Meeting Area
REC: Investigate storage area for equipment
and rotate meeting place among classes.
4.
Walkway to back
stage in theatre
REC: Accomplish within next 3 years.
5. Middle School
Meeting Place
REC: Reassess need in two years.
6.
Greenhouse/Recycling Compost Center
REC: Ask Science Department to work on
design, needs, size, cost, etc. Committee
will review when plans are submitted.
7. Rehearsal Room for
Large Music Groups
REC: Ask Arts Department to reassess needs
after dance studio is moved.
8. Distance Learning
Equipment in Teleconference Room
REC: Reassess need in 2 years.
9. Classroom to be
Used in Library as Teaching Space
REC: Reassess need in 2 years.
10.
Teacher
Work/Study Room in Library
REC: Better publicize area already there.
11.
Rubberized
Surface for Track
REC: Have completed by August, 2002.
12.
Dugouts for
Baseball Field with Storage
Space for Equipment
REC: Have completed by Spring, 2002.
13. Conveyer Belt for
Dish Room Area
REC: Reassess need in one year.
14. Advancement
Office needs Additional Office
REC: Reassess need in one year. Could shift IS
from A111 into new office.
15.
Upper School
Student Lounge
REC: Consider locating one in SEA.
16. Observatory for
Telescope
REC: Ask Science Department to determine
mounting location for telescope without
building separate facility. If under $10,000,
fund out of annual capital budget.
17.
Amphitheatre
REC: Refer to landscaping committee and fund out of
annual capital budget.
18.
PA System and
Covered Video Area for Track/Soccer Fields
REC: Reassess need next year.
19. South bleachers
in gym reconfigured to allow for
bleacher extension with team and scorer area.
REC: Reassess need in one year.
20.
Improvement of
Existing Practice Fields
REC: Proceed immediately.
21. Permanent Seating
Area for Coaches/Officials
at Cross Country Start
REC: Build by August, 2001.
22.
Additional
Outdoor Storage for Track & Field
Equipment
REC: Reassess need next year.
23.
Display case for
autographed books
REC: Complete by June, 2001.
|
[REC:
Reassess LT needs in one year and
determine a suitable timeline.]
1.
Finish Orchestra
Pit
2. Aquatic Research
Area (pond)
3.
Six Foreign
Language Classrooms
REC: Include in SEA or Upper School
when SEA is built
4. Mobile Shelving
for Library Books
5. Storage area for
textbooks, educational
materials, furniture, etc
6.
Wireless Network
Stations Outdoors
7.
Plastic Bleachers
for Soccer/Track
8.
Additional Game
and Practice Fields
9.
Charger Head Logo
put on Fitness Center
Lobby Floor
10. Word
"Charger" landscaped into hill on south
end of soccer/track facility.
|